Ferromolybdän
FeMo

Ferromolybdän

Ferro Molybdenum (FeMo) is a master alloy carrying Mo ≥ 60% that delivers molybdenum into steel melts without the oxidation losses of metallic Mo. Added to the ladle or EAF, it raises hardenability, high-temperature strength, and resistance to pitting and creep; in stainless and pipeline grades Mo stabilizes the passive film and counters chloride attack. Typical additions run roughly 0.1-0.5 wt% Mo for alloy and pipeline steels and up to ~2-4 wt% in tool and heat-resistant grades, dosed against the target Mo aim and recovery. The standard FeMo 60 grade holds C ≤ 0.10%, Si ≤ 1.0%, P ≤ 0.05%, S ≤ 0.10%, Cu ≤ 0.50%, sized 10-50 mm to ASTM A132 / ISO 5452; a low P/S FeMo 65-70 is available on request for cleaner-steel routes. Every lot ships with COA (EN 10204 3.1) and MTC, XRF/ICP verified at Mo ≥ 60%. Multi-regional sourcing supports CIF Marmara delivery and Gebze bonded stock, 20 MT FCL or 5 MT LCL lots. Send your target Mo%, grade, and tonnage for a current RFQ.

Technische Spezifikationen

Mo≥ 60%
C≤ 0.10%
Si≤ 1.0%
P≤ 0.05%
S≤ 0.10%
Cu≤ 0.50%
Körnung10-50mm

Arsam-Standard

GradesFeMo 60 (Standard) · FeMo 65-70 niedrig P/S (auf Anfrage)
Internationale ReferenzASTM A132 · ISO 5452
Verpackung1 t Jumbo-Big-Bag · palettiert · FCL-Container
DokumentationCOA (EN 10204 3.1) · MTC · Strahlungszeugnis · CoO · EUR.1 / A.TR (EU)
QualitätskontrolleXRF/ICP-Analyse · Chargenannahme bei Mo ≥60%
Mindestbestellmenge20 t FCL / 5 t LCL
IncotermsFOB / CIF / CFR / DAP
LieferzeitSee CIF 28-35 Tage · Zolllager Gebze 24-48 h · alternativ Straße/Fähre 12-21 Tage

Internationale Standards dienen als Referenzgrundlage; Zertifikate werden auf Anfrage mit Dokumentenprüfung bereitgestellt.

Anwendungen

Industrielle Anwendungen
Alloy steel
Stainless steel
Tool steel
Heat-resistant steel
Pipeline steel

Häufig gestellte Fragen

What is the Mo content of Arsam FeMo?
Mo ≥60%, standard alloy steel production spec. On request, Mo 65% + low P/S grade available. C ≤0.10%, Si ≤1.0%, P ≤0.05%, S ≤0.10%, Cu ≤0.50%, size 10-50mm.
What is the MOFCOM export license lead time?
As of Q2 2026, 4-6 weeks in queue. Arsam maintains a risk backup via an alternative international source portfolio, in case of MOFCOM delay, a 21-day delivery alternative channel is active.
How is the FeMo CIF İzmit average price determined?
LME moly $/lb spot + CIF logistics + margin. For the Q2 2026 spot band, contact info@arsammetal.com, updated quote within 4 hours (TR foundry speed discipline).
What is the minimum order?
20 MT FCL or 5 MT LCL. From the MENA Dubai office, 3-5 day delivery to MENA mills; for TR foundries, 24h shipment option via the Gebze bonded warehouse.
Are COA + MTC + radiation certificate standard?
Yes, COA + MTC + Radiation Certificate are standard package for every lot. SGS / Bureau Veritas / Intertek 3rd party inspection option available (on request, complimentary for premium customers).

Einsatz in diesen Branchen